Project transition to IMD-EL

27 oktober 2020

In co-operation with HSB, Techem Sverige AB and Vintrie El AB the project to transit to IMD-EL will begin week 46.

 

The work means a total power cut for two days: 
12/11 at 8.00-17.00 and 13/11 at 8.00-15.00.

 

Please note: 
The elevators, the laundry machines, the Network Wifi, warm water, refrigerators etc. will be affected. 

 

The following will work as usual:
The outer doors and the garage door will work through a battery backup.